Mayfair Aangan Possession & Construction Status Updates

Timeline Schedules, Structural Milestones & Handover Protocols

Tracking Structural Milestones & Handover Schedules

For purchasers investing in an under-construction home, tracking physical site milestones provides peace of mind. This resource provides current construction context, milestone schedules, and key handover procedures for Mayfair Aangan Dahisar East.

Construction Progression Phases

  • Phase 1: Sub-Structure & Foundation: Comprehensive piling work, excavation, and casting of earthquake-resistant reinforced concrete foundation slabs.
  • Phase 2: Superstructure & Slabs: Casting of RCC structural floor plates across podium and residential levels.
  • Phase 3: Masonry & External Plaster: Solid blockwork, external weather-proof plastering, and double-glazed window installations.
  • Phase 4: MEP & Internal Finishes: Electrical conduits, water piping, tiling, elevator installations, and designer lobby finishing.
  • Phase 5: Statutory Inspection & OC: Final inspections by civic authorities, issuance of the Occupancy Certificate (OC), and phased home possession.

Homebuyer Handover Inspection Checklist

During the final apartment key handover, prospective homeowners should complete a joint snagging inspection with site engineers:

  1. Inspect doors, locks, window sliding tracks, and glass panes for proper seal and smooth operation.
  2. Test electrical switchboards, earthing systems, and MCB panels.
  3. Check plumbing drainage, tap water pressure, and bathroom waterproofing seals.
  4. Verify execution of electric meter transfer and cooperative society membership documentation.

Notice: Project possession schedules are subject to MahaRERA filings and municipal authority permissions. Please consult official sales channels for exact individual unit handover schedules.

Frequently Asked Questions

What is the expected possession timeline for Mayfair Aangan?

Anticipated possession timelines are synchronized with the officially declared completion dates filed on the MahaRERA public portal, subject to civic authority permissions.

How can buyers monitor construction progress?

Buyers can monitor ongoing progress via quarterly progress reports (QPRs) on the MahaRERA portal or by scheduling verified on-site visits with our team.

What is an Occupancy Certificate (OC)?

An Occupancy Certificate is a statutory document issued by the local municipal corporation certifying that the building has been constructed according to approved plans and is safe for residential habitation.

Can buyers perform a pre-possession snagging inspection?

Yes, purchasers are entitled to conduct a thorough pre-possession inspection to record any finishing snags before final key handover.

Enquire for Mayfair Aangan Dahisar

Connect with our property advisory desk for verified cost sheets, floor plans, and priority site visits.

Your privacy is respected. No spam.